| |
55,000 sf of new construction and miscellaneous remodel of existing building to provide more space for the junior high school students. New construction includes two classroom wings, gymnasium, a cafeteria, band room and other miscellaneous circulation areas such as corridors, elevators, and stairs. Portions of the new construction attached to the existing building and required creative structural support solutions.
|